facebook
Othonos 39, 17343
Agios Dimitrios Athens
Mon-Fri
09:00 - 17:00

Next Energy (250 – 600 KVA)

Next Energy (250 – 600 KVA)

On Line UPS

Riello UPS Introduces NextEnergy, the latest UPS series designed for mission critical applications. The three phase UPS offers transformerless double conversion technology VFI SS 111, with integrated IGBT three-level design.

Features

Technical Specifications

Product Brochure

Product Video

NextEnergy is designed to meet the power requirements of tomorrow, offering high efficiency and low running cost. Thanks to the Efficiency Control System, NextEnergy also guarantees the highest levels of efficiency even at partial loads. Its unity power factor and easy system upgrading make it the ideal solution for the business continuity of any IT application. Zero impact source NextEnergy is designed with the latest technology to not only prevent disturbances on the mains but clean the power e.g.. Harmonics generated by non-linear loads.

The input AC/DC converter is based on the IGBT rectifier design using the latest 3-level technology. The key features are:

  • input current distortion < 3%
  • input power factor 0.99
  • power walk-in function that ensures progressive rectifier start-up
  • start-up delay function, to restart the rectifiers when mains power is restored.

Thanks to the programmable maximum input power (kW or kVA), NextEnergy can be installed into AC supply systems with limited power availability such as a diesel generator or contractually reduced power sources, andthen supply the additional power required using the batteries (peak demand function). Outstanding performances

  • The latest technology of NextEnergy and the careful selection of high-quality components help to achieve first-class performance such as unity power factor (kW/kVA) and the capability to supply capacitive loads, which are very common in most Data Centres, without any power derating up to 40 °C.
  • Outstanding system efficiency up to 97% in on-line double conversion mode, increasing to 99% in stand-by mode or smart-active.
  • The unit design adopts the forced ventilation method to extract the heat produced by the internal components. Specific attention has been given to the ventilation system to ensure the best operational level and lifetime.

This is thanks to the automatic speed control which constantly adjusts to the specific load level, the fan failure alarm and the fan redundancy – with condition apply.

Battery care system

The battery is one of the most important parts of the UPS that ensures the correct operation in case of mains failure. NextEnergy includes all the latest features to prolong the battery life and keep the battery working efficiently, as well as advising users about any potential problem. The variety of charging methods allows the use of the most common type of battery and technologies available on the market such as VLRA, AGM, GEL, NicCd etc. In addition to the flexibility of the battery cells, NextEnergy allows users to choose the most cost-effective solution for the required back-up time. The battery charging and discharging is assured by the STEP-UP/ STEP-DOWN converter which means that when the batteries are charged and the mains is available, the converter is no longer connected to the supply. This means the ripple current is practically zero which leads to a significant improvement in battery life.

Operation without Neutral

NextEnergy can work with or without the neutral connection. This is an important feature to reduce the TCO of the distribution system where the neutral is created by an isolation transformer close to the load. For example, in the modern Data Centre, or where the neutral is not used at all. The major benefit being a reduced cost of the distribution arrangements.

Easy installation

  • The small footprint of the cabinet and complete front access for all maintenance activities, ensures maximum space for installation and service.
  • NextEnergy includes top and bottom cable entry as standard, removing the need for large and costly top entry cabinets.
  • Ventilation is from the front to the top so no additional rear clearance required.

Maximum reliability and availability

NextEnergy UPS can be connected in parallel with up to 8 units to increase the capacity or add redundancy (N+1). Considering that a typical load can vary from 20 to 80%, the Efficiency Control System (ECS) function optimises the operating efficiency of the entire system according to the power absorbed by the load. This ensures higher overall efficiency during all load conditions. Hot System Expansion (HSE) allows the addition of further UPS into an existing system, without the need to switch off the operational units or transfer them to bypass mode. This guarantees maximum load protection, even during maintenance and system expansion. It ensures maximum levels of availability – even in the event of an interruption to the parallel control cable the system is “FAULT TOLERANT”. It is not affected by connection cable faults and continues powering the load without disruption, signaling an alarm condition.

Interactive Touch Screen

NextEnergy is equipped with a Touch screen 7” graphic display (800×480 pixels) providing UPS information, measurements, voltage and current waveforms, operating states and alarms in different languages. The default screen displays the UPS status, graphically indicating the status of the various assemblies (rectifier, batteries, inverter, bypass). Also, the panel is used for configuration and setting the parameters of the UPS with 3 levels of the security password.

Advanced Communication

NextEnergy offers the capability to work with the advanced multi-platform communications for all the latest operating systems and network environments.

  • PowerShield3 monitoring and shutdown software included for Windows operating systems 10, 8, 7, Hyper-V, 2016, 2012, and previous versions, Mac OS X, Linux, VMWare ESXi, Citrix XenServer and other Unix operating systems.
  • Compatible with PowerNetGuard remote monitoring service.
  • 2 slots for the installation of the optional communication accessories such as network adapters and BMS interface.
  • Ethernet and USB ports.
  • Relay cards with customized alarms and commands.

MODEL ΝΧΕ 250 ΝΧΕ 300 ΝΧΕ 400 ΝΧΕ 500 ΝΧΕ 600

INPUT

Nominal Voltage 380-400-415 VAC three-phase
Voltage Tolerance  +20% -40% (conditions applied)
Frequency 40-70 Hz
Power Factor 0,99
THDI [%] <3%
Soft Start 0-100% in 120 sec (selectable)
Standard Equipment Provided Back feed preotection, seperate bypass line

BATTERIES

Type VRLA AGM / GEL, NiCd, Supercaps, Lion, Flywheels
Ripple Current Zero
Recharge Voltage Compensation -0.11Vx° C

OUTPUT

Nominal Power (KVA) 250 300 400 500 600
Active Power (KW) 250 300 400 500 600
Number of Phases 3+Ν
Nominal Voltage 380-400-415 VAC Three phase + N
Static Stability  ±1%
Dynamic Stability  ±5% in 10ms
Volotage Distortion <1% with linear load /<3% with non-linear load
Frequency Stability on Battery  ±0,05%
Frequency 50 or 60 Hz (selectable)
Overload 110% for 60′; 125% for 10′;150% for 20 seconds 110% for 60′; 125% for 10′;150% for 1 minute 110% for 60′ ; 125 for 2′ ; 150% for 20 seconds 110% for 60′ ; 125 for 10′ ; 150% for 1 min.

BYPASS

Nominal Voltage 380-400-415 VAC three phase +N
Nominal Frequency 50 or 60 Hz (selectable)
Frequency Tolerance  ± 2% (selectable from ± 1% έως 5 %)

INFO FOR INSTALLATION

Weight (kg) 634 880 1100 1300 1600
DImensions (WxDxH) (mm) 800 x 850 x 1900 1200 x 850 x 1900 1400 x 850 x 1900 1600 x 850 x 1900 2000 x 850 x 1900
Input Cable Bottom Up and Bottom Up and Bottom Bottom Bottom
Remote Signals Volt-free contract (configurable)
Remote Controls EPO, bypass and another spare
Communications USB + Dry contacts 2 slots for communications cards
Operating Temperature 0 ° C/ +40 ° C
Relative Humidity 5 to 95% non-condensing
Color Dark grey RAL 7016
IP Rating IP 20 (other on request)
Efficiency (AC-AC) – On Line Mode Up to 97%
Standars Safety: EN 62040 -1 (directive 2014/35/UE); EMC: EN 62040 -2 (directive 2014/30UE)
Classification in accordance with IEC 62040-3 (Voltage Frequency Independent) VFI – SS- 111
MOving the UPS Pallet

 

 

 

 

 

 

 

 

Download the Pdf here

 

 

 

 

 

Watch the video here.                                                                       Watch the video here.

 

 

 

 

 

Watch the video here.                                                                  Watch the video here.

 

 

 

 

 

Watch the video here.                                                         Watch the video here.

 

 

 

 

 

Watch the video here.                                                             Watch the video here.

 

 

 

 

 

Watch the video here.                                                          Watch the video here.

CALL US
CONTACT US